DPW-25570-ITD D-4 Building Roof and Window Replacement

ITD D4 Building roof and window Replacement

Status

Accepting Bids

Prebid Date 5/14/25 2:00pm
Bid Date 5/22/25 2:00pm

Company & Contacts

Myers Anderson Architects
Richard Creason  
208-232-3741

Location

Shoshone, ID

A description of the work of this project can be summarized to include: The removal of the existing ballasted, approximately 2,500 sq. ft. and none ballasted

approximately 6,800 sq. ft., single-ply roof membrane down the existing roof deck. New 6” of rigid insulation shall be installed on the entire roof. New 80 mil

single-ply roof membrane to be installed over the entire roof including new metal coping, flashings and terminations.

Estimated Cost: $800,000.00