DPW-24227-ISU Install 2nd Cooling Tower Connection

Installing 2nd fluid Cooler on the heat pump loop, new piping, electrical power and controls installation.

Status

Accepting Bids

Prebid Date 2/20/25 10:00am
Bid Date 3/5/25 2:00pm

Company & Contacts

Idaho Division of Public Works
Barry J. Miller  
208-332-1900

Location

Meridian, Idaho

A description of the Work of this project can be summarized to include: Installing a 2nd fluid cooler on the

heat pump loop, new piping, electrical power and controls as required for the installation. This also

includes the installation of a new chemical feed system for the new fluid cooler. A new enclosure will

be built to screen the new fluid cooler.

Estimated Cost: $534,750.00