A description of the Work of this project can be summarized to include: Milling and overlay of
approximately 400-feet of existing asphalt roadway/drive aisle. Asphalt pavement section removal of
approximately 300-feet of existing asphalt roadway/drive aisle. Work expected to include traffic control,
pedestrian control, asphalt saw cutting, asphalt pavement removal, installation of erosion control
measures, road base fine grading, clean-out valve box and catch basin adjustments and topographic survey
of installed asphalt pavement. The project may involve additional work for soft spot repairs and pavement
repairs. Extents of the additional work are unknown and will be field determined by the geotechnical
engineer.
Estimated Cost: $147,000.00